Thursday, June 9, 2011

Preparing Your Walk-In Bathtub For Suitable Installation

Cases of damaged-while in-shipping merchandise are generally identified to walk-in bathtub vendors. Hence, it is critical to make certain that your walk-in tub package will be insured by a shipping provider prior to creating an actual obtain. Examining the package deal for any visual damages really should be completed previous to unpacking the walk-in tub. Installer has to properly seem for any dents/scratches on the package deal.

Even even though stroll-in bathtubs are normally produced from acrylic and/or fiberglass, weighty-duty elements, the plumbing connections are normally fragile and need to have to be handled with care and caution. stroll in tubs can certainly not be lifted by plumbing connections performing so can consequence in future leaks. Examine the warranty explanation cautiously in advance of the set up. Some firms can refuse accepting the return. As soon as you built guaranteed that your walk-in bathtub has arrived securely and that there are no visual damages, feel free to proceed to the testing phase which consist of just a handful of effortless steps. Note that even though walk-in tubs are typically tested at the factory, a great deal of periods damages in the plumbing connections can occur for the duration of transportation or packing. For a entire test of the walk-in bathtub, you are going to need to have a flat surface area and spot substantial ample to let accessibility to the stroll-in tub from all sides in case of a leak and drain the tub right after the testing method is finish.

Site the stroll-in tub of the flat, evenly-leveled surface area.

Following, push the PVC pipe as a result of the hole you just designed in the floor. Make certain it connects to the larger opening. You can then use your PVC glue to attach the pipe coupler, which connects the Clawfoot bath pipes to the ones in your wall. Go in advance and flip of the principal drinking water supply, clean the region, and provide in your Clawfoot tub.

Now that you have obtained your Clawfoot bathtub in position, you can get started to attach your Clawfoot bathtub fixtures. In advance of you do this you want to make certain all of your plumbing is in site. If all the plumbing appears to be to be in buy then you can go ahead and connect your Clawfoot tub fixtures to the cold and scorching drinking water pipes. You can hook up your Clawfoot bathtub fixtures by utilizing elbows and pipe sections. Subsequent, you will want to in shape your Clawfoot bathtub drain gasket and waste line. This can be attained by using your PVC glue for the line and a wrench to finish tightening down your gasket. Don't neglect to screw in the strainer cap.

The very last point you want to examine is bathtub drainage. You need to attach the drainpipe to the overflow hole and lock it in position with the retainer. Then you will want to make positive your tub drain does hook up to the floor drain. Also, really don't neglect to make sure you have a P-trap installed currently. Lastly, examine the plumbing for leaks and make certain all the compression fittings are restricted. granite Bay Plumber, Granite Bay Plumbing, Granite Bay Plumbing

No comments:

Post a Comment